메뉴 바로가기
주메뉴 바로가기
컨텐츠 바로가기

Elastic Flooring for Sports Facilities

Elastic Flooring for Sports Facilities

Elastic sports flooring is used not only for park walkways, jogging paths, and bike lanes, but also for school tracks, basketball and volleyball courts, as well as multipurpose sports facilities such as tennis and badminton courts.

In particular, the products manufactured and supplied by Daerim Geonyeong use eco-friendly raw materials that are free from harmful substances and heavy metals. As a result, they have been awarded the Environmental Label Certification by the Korea Environmental Technology & Industry Institute under the Ministry of Environment, as well as KS Certification from the Korean Standards Association, recognizing their superior quality.

It is a safe product with excellent elasticity, providing a lively feel during exercise and walking, reducing fatigue, and minimizing stress on joints and risk of injury

Product Image

  • school tracks

  • walkway

  • multipurpose sports facilities

  • tennis courts

Product List

G2B No. Model name Specification Price
(per ㎡/KRW)
Certification
22818628 GreenSP15 Lower elastic layer +
upper urethane(Embo chip finish), T15
59,500
22818629 GreenSPP15 Lower elastic layer +
upper urethane, T15
54,800
23220868 GreenSP15-S Lower elastic layer(SBR) +
upper urethane(Embo chip finish), T15
55,150
23220869 GreenSPP15-S Lower elastic layer(SBR) +
upper urethane, T15
51,300
21613968 WR15 Color elastic chip 100%, T15 51,400
23925263 WR15-7S Color elastic chip 70% +
black SBR elastic chip 30%, T15
44,760
23925263 WR15-8 Color elastic chip 80% +
black EPDM elastic chip20%, T15
49,000
21613967 WR20 Color elastic chip 100%, T20 60,400
23020768 DR-SPR3, t3㎜, 4종 upper urethane(Embo chip finish), T3 34,800
23020769 DR-SPR5, t5㎜, 4종 upper urethane(Embo chip finish), T5 51,000
23020770 DR-SPR9, t9㎜, 4종 upper urethane(Embo chip finish), T9 61,800
23020771 DR-SPR13, t13㎜, 4종 upper urethane(Embo chip finish), T13 73,000

Construction Sequence

  • 1

    Surface Preparation
    (Primer Coating)

  • 2

    Base Layer
    (Elastic Layer) Installation

  • 3

    Surface Treatment of Elastic Layer(sealimg)

  • 4

    Apply urethane evenly over the surface(twice)

  • 5

    Embossed Layer Installation

  • 6

    Top Coating

  • 7

    Line Marking

상단 이동